On January 29, 2018 Dominion Energy is expected to resume their project to replace a pad mounted switch with a new VFI pad mount switch (at Orchard Lane entrance to Waterview Cluster), remove a pad mount transformer (adjacent to 11400 Orchard Lane), and replace underground cable that runs from the entrance area along the property line between Waterview Cluster and Lakeside Cluster to the 11400OL-11408OL block. Utility markings are in place. The work is necessary to ensure the reliability of electrical power to that block and was supposed to have been completed last August, but was delayed for unknown reasons.