Please find the below listed items discussed at today’s site meeting. Feel free to contact me with any questions or concerns regarding these minutes. So far things are progressing well and I am happy with the communication within the team.Schedule· Weekly meetings will continue to be held at the stock pile area weekly on Wednesdays at 8:30;· Orange fence and construction entrance are installed;· Clearing is completed;· Stream Construction 12/1-1/31/18. Second crew the week of 12/4. Construction will commence at the top of the main channel on 12/1 and in tributary 1 the week of 12/4;· Equipment and material deliveries to commence immediately.Site Access· No issues with parking or community at this time. Ongoing communication will be necessary as the project progresses with the HOA liaisons.· Orange fence will be strung across construction entrance when construction is NOT active, to prevent pedestrian traffic.Clearing· Discussed again- T38662 (holly on the upstream side of the confluence of main stem and trib 3) to remain if possible. We will revisit as construction gets closer to this tree. The flagging was removed today to prevent premature removal;· Karen and Charlie requested to keep a group of small hollies along the right bank of trib 3 if at all possible. We will revisit as construction gets closer to these trees.General· A work order for removal of the light along the trail has been placed. Bob Hayler is the POC. Work has been scheduled;· TDS will remove the garbage can along the trail at the top of the site and replace after construction is complete;· The first contractor on site in the morning is responsible for closing the gates along the pedestrian pathways and the last contractor to leave the site for the day is responsible to open the gates in the evening;· WSSI provided PPE for HOA liaisons’ during construction meetings. It is best if they do not enter the site during construction for safety reasons;· Bridge permits are still in county review but we still anticipate installation in early January. I will provide the HOA with the maintenance and projected life of bridges for future maintenance budgeting;· The current alignment of the step pool at station 11+10 will result in a portion of the left bank of the structure will be on Sunderbriar property. A request to adjust the pool to the right was made to keep the activity off the Sunderbriar property.· Design team will review restoration activity at station 10+00 - 10+35 main stem due to proximity of ornamental tree;· The concrete at the construction entrance has a crack, that was present prior to construction activities. This concrete will likely be replaced at the end of the project due to construction traffic;· TCOT is working with Waterview Cluster to have several trees removed off site. Rick will coordinate with TDS for access to these trees through Lake Anne West construction site. This work should be done sooner than later.Have a good evening.Jason
Maintaining current contact information helps the board and its
committees reach owners and tenants with important board announcements
as well as during emergency events such as a water/gas main break or to
report storm damage to vehicles or other property. Each owner
and paying tenant should complete a separate form.
Non-resident owners should enter their address at the end of the
form. Note: You do NOT need to have a Google account in order
to update and submit the form.
!doctype>
November 30, 2017
Stream update
November 28, 2017
Final Clusterwide Leaf Pickup
SECOND / LAST LEAF PICKUP of 2017:
MONDAY and TUESDAY, DECEMBER 11 AND 12
If you'd like your leaves picked up at this time, please rake them into piles either in the street along the curb or to common areas, but be careful not to pile them at storm drains.
AFTER THIS SECOND and FINAL SCHEDULED LEAF PICKUPON DECEMBER 11 AND 12, RESIDENTS ARE REQUIRED TO BAG THEIR LEAVES AND PUT AT CURBSIDE FOR REGULARLY SCHEDULED WEDNESDAY YARD WASTE PICKUP.
RESIDENTS ARE NOT TO LEAVE UNBAGGED LEAVES ON CLUSTER COMMON AREAS. THEY WILL NOT BE PICKED UP!
November 17, 2017
Stream Renovation Update
Please find the below listed items discussed at today’s site meeting. Feel free to contact me with any questions or concerns regarding these minutes. So far things are progressing well and I am happy with the communication within the team.Schedule· Weekly meetings will continue to be held at the stock pile area weekly on Wednesdays at 8:30. We will not have a meeting on November 22nd.· Work will not occur on site November 23 or 24 due to the Thanksgiving Holiday· Orange fence and construction entrance are installed;· Clearing upstream of the construction entrance and tributary are complete. Completion anticipated November 29th.· Stream Construction 11/27-1/31/18.Site Access· No issues with parking or community at this time. Ongoing communication will be necessary as the project progresses with the HOA liaisons.· TDS will install a 4’ gate at the Tributary 3 bridgeClearing· Discussed again- T38662 (holly on the upstream side of the confluence of main stem and trib 3) to remain if possible. We will revisit as construction gets closer to this tree. The flagging was removed today to prevent premature removal;· Karen and Charlie requested to keep a group of small hollies along the right bank of trib 3 if at all possible. We will revisit as construction gets closer to these trees;· TCOT is to repair orange fence damaged during clearing operations.General· A work order for removal of the light along the trail has been placed. Bob Hayler is the POC; Meeting to be held November 16th at 1:00.· TDS will remove the garbage can along the trail at the top of the site and replace after construction is complete;· The first contractor on site in the morning is responsible for closing the gates along the pedestrian pathways and the last contractor to leave the site for the day is responsible to open the gates in the evening;· WSSI provided PPE for HOA liaisons’ during construction meetings. It is best if they do not enter the site during construction for safety reasons.· Bridge permits are still in county review but we still anticipate installation in early January. I will provide the HOA with the maintenance and projected life of bridges for future maintenance budgeting.· Rick will consider providing additional pieces of equipment to aid the clearing operation in the removal of felled logs chipper.· TDS will have a Porta potty delivered to the site this week.Happy Thanksgiving!John P. Connelly, PWS, CPESC |Manager-RestorationISA Certified Arborist MA-4857A
November 15, 2017
No trash service on Thanksgiving
Happy Thanksgiving to everyone.
Just a reminder that there will be no trash service on Thanksgiving Day.
Please refrain from putting your trash and recycling at the curb until Sunday evening
the 26th of November. Our neighbors and their guests thank you in advance.
Thank you.
Just a reminder that there will be no trash service on Thanksgiving Day.
Please refrain from putting your trash and recycling at the curb until Sunday evening
the 26th of November. Our neighbors and their guests thank you in advance.
Thank you.
October 2017 BOD Minutes
Here is a link to the October Minutes of the board meeting.
https://drive.google.com/file/d/1ksSpGk7fcV_1hEQ6mVKe47CH1FQkBoUi/view?usp=sharing
https://drive.google.com/file/d/1ksSpGk7fcV_1hEQ6mVKe47CH1FQkBoUi/view?usp=sharing
November 9, 2017
November Board Meeting
The Waterview Cluster Board of Directors will meet at 11463 Waterview on Monday, November 13, 2017 at 7:00 PM.
Updates
IMPORTANT CHANGE IN FUTURE POSTINGS FOR LEAF PICKUP SCHEDULES AND FOR STREAM RENOVATION UPDATES. THESE WILL ONLY BE POSTED AT: waterviewcluster.org
Notice of this change is being posted to Yahoo group list. Please pass this along to any neighbors you know who may not be on the yahoo group list as they may not have received this information.
FIRST LEAF PICKUP: November 16 and 17, Thursday and Friday of next week. If you'd like your leaves picked up, please rake them into piles either in the street along the curb or to common areas, but be careful not to pile them at storm drains.
SECOND LEAF PICKUP: Dates TBD in early to mid-December. Exact dates for this pickup will be posted as soon as they are available but only on the cluster website.
Minutes of Stream Restoration meeting
Please find the below listed items discussed at today’s site meeting. Feel free to contact me with any questions or concerns regarding these minutes.Schedule· Orange fence and construction entrance are installed;· Clearing has begun and is anticipated until 11/29 (Staging area, Trib 1 and top of main stem to be completed first);· Stream Construction 11/20-1-1/18/18.Site Access· 1 parking spot adjacent to Construction Entrance will need to be reserved/ blocked off. No complaints as of the time of the meeting.Clearing· T38662 (holly on the upstream side of the confluence of main stem and trib 3) to remain if at all possible. We will revisit as construction gets closer to this tree. The flagging was removed today to prevent premature removal;· Karen and Charlie requested to keep a group of small hollies along the right bank of trib 3 if at all possible. We will revisit as construction gets closer to these trees;· TCOT is to repair orange fence damaged during clearing operations.General· A work order for removal of the light along the trail has been placed. Bob Hayler is the POC;· RA pathway crew will no longer be maintaining the trail within the LOD;· TDS will remove the garbage can along the trail at the top of the site and replace after construction is complete;· RA has placed trail closed signs but, will be adding additional language;· The first contractor on site in the morning is responsible for closing the gates along the pedestrian pathways and the last contractor to leave the site for the day is responsible to open the gates in the evening;· WSSI/RA to provide PPE for HOA liaisons’ during construction meetings.Jason Beeler ISA Certified Arborist MA-5442A, PWS, CPESC, CESSWI, CISECPrincipal Restoration Specialist/Assistant Manager
Subscribe to:
Posts (Atom)